# LAND DECOMMISSIONING 

![600x300_well-decommissioning-v2](https://www.foroenergy.com/hubfs/600x300_well-decommissioning-v2.jpg "600x300_well-decommissioning-v2")

TOTAL CAPABILITIES

- 5” through 20” multistring internal severing
- 2-7/8” and Up steam injection well external severing
- Unaffected by tar in the annular space
- Successfully cut up to 3 string well configuration surrounded by 42” cement vault in under 1 hr
- Average time on site = 2.2 hrs state time at wellsite
- Unaffected by lack of cement and loose casing strings
- 3-5 times smaller excavation footprint compared to conventional methods

![land-decomissioning-1](https://www.foroenergy.com/hubfs/land-decomissioning-1.jpg "land-decomissioning-1")

MOBILE LASER CUTTING UNIT CONFIGURATION

- 180 kVa generator
- 20 kW laser
- 20,000 BTU Chiller
- Climate controlled operator cabin
- Liquid Nitrogen storage (capacity for up to 7 cuts / day)
- Smog Hog for Air Quality Assurance

Foro’s innovative land decommissioning system of the Mobile Laser Cutting Unit and Multiconductor Cutting Tool can be configured for internally cutting the casings from internal to external, or if the production tubular has been cemented to surface, the Multiconductor Cutting Tool can be configured for external to internal severing.

![Minimize Excavations](https://www.foroenergy.com/hubfs/Excavations.png)

Minimize Excavations

- Reduce the size of excavation
- Eliminate need for personnel to enter the excavation.
- Reduce time the excavation remains opened.

![Minimize Excavations](https://www.foroenergy.com/hubfs/Risk.png)

MITIGATE RISK TO PEOPLE

- Crew size reduced
- Minimize touches
- No work in confined space, at heights, or with equipment

![Minimize Excavations](https://www.foroenergy.com/hubfs/Efficiency.png)

IMPROVE EFFICIENCY

- Cut multi-conductors regardless of condition of conductors, grouting, or eccentricity.

![Minimize Excavations](https://www.foroenergy.com/hubfs/Cost.png)

REDUCE COST TO CUSTOMER

- Well decommissioning timeline reduced by 91%

  

Offshore & Subsea Decommissioning

## Offshore & Subsea Decommissioning

[Learn More](https://www.foroenergy.com/offshore-decomissioning?hsLang=en)

---

  

Production Enhancement

## Production Enhancement

[Learn More](https://www.foroenergy.com/production-enhancement?hsLang=en)

---

  

Drilling

## Drilling

[Learn More](https://www.foroenergy.com/drilling?hsLang=en)

---